Construction of buildings and metal structures at Chovdar Ore site Learn more Adsorption, desorption and major overhaul of saturated and unsaturated pools located at the processing factory in Chovdar Ore site Learn more Road construction from the processing area of Chovdar Ore site to the Aghyokhush Marakh Learn more Relocation, removal and placement of ores collected in the designated part at the 1st ball leaching area situated in Chovdar Ore Processing Site of the Dashkesan region Learn more Overhaul of roofing and rainwater pipelines between 3-6 axes at the 2nd pass of the main production building in “Baku Steel Company” LLC Learn more Overhaul of the electric arc furnace canopy at the 2nd pass of the main production building in “Baku Steel Company” LLC Learn more Site preparation and foundation construction of “Lazzari” connection and templating machine in the piping section located in “Azerboru” OJSC Learn more Renovation of office building located in Icherisheher Learn more Construction and installation works of Tulallar-Zurnabad-Ganja settlement, around Karamli and Gushchu village Learn more